FAIL (the browser should render some flash content, not this).
 

 

   
 

 

 

 

 

Emergency Generator Tank Replacements:

   
PROJECT: Emergency Generator Tank Replacements at various New Jersey sites
CLIENT: Fortune 100 Communications Company
DETAIL: Removed several sizable leaking USTs from mountain top microwave transceiver facilities. Supplied temporary fuel storage. Installed piping banks, connections made through leak and fire detection solenoid valves. Finishing included asphalt, ballards, guardrails and overfill instrumentation.
 

Back to Search by Commercial Project Type

   
Leaking Underground Storage Tank Removals and Soil Remediation:
   
PROJECT: Leaking UST Removals and Soil Remediation
CLIENT: Dye Manufacturer, Newark, Essex County, NJ
DETAIL: Removed several large #4 oil leaking underground storage tanks from a congested plant in an urban setting. Designed and installed free product recovery trenches to intercept and collect oil, then a vacuum pump bagged extraction system installed inside large diameter recovery wells, located at juncture of recovery trenches. Site restoration included sidewalk, curbing and roadway replacement.
 

Back to Search by Commercial Project Type

   
Phase I and II Investigations:
   
PROJECT: Phase II and III Investigations
CLIENT: Private Land Developer, Jersey City, Hudson County, NJ
DETAIL: Anco conducted split-spoon and Geoprobe sampling for soil investigation to determine the extent of soil contamination at an impacted site. Installed groundwater piezometers and completed a groundwater investigation. Developed cost-effective remediation strategies to address contamination at the site including a technique to remediate the contaminated soil on-site.
 

Back to Search by Commercial Project Type

   
Regulated Tank Closure and Site Remediation:
   
PROJECT: Regulated Tank Closure and Site Remediation
CLIENT: Former Gas Station, Linden, Union County, NJ
DETAIL: Coordinated the removal of 8 regulated tanks and subsequent remediation of nearly 1000 tons of contaminated soil at a former gas station in preparation for a sale of the property to an auto body shop. Worked closely with NJDEP, utility companies, local building department officials, and the Union County Road Department, as contamination migrated into street. Assisted in the preparation of documents for state funding and grants from the New Jersey Economic Development Authority to lessen the owner's payment obligations.
 

Back to Search by Commercial Project Type

   
Underground Storage Tank Dispensing System Replacement:
   
PROJECT: UST Dispensing System Replacement
CLIENT: United Parcel Service at Newark Airport, Newark, Essex County, NJ
DETAIL: Installed spill and overfill mechanisms, leak detection conduiting, double-walled piping systems, piping sumps, dispensers and all tank attachments for two large USTs located along runway at airport. Finish work included lighting, concrete islands and new reinforced concrete pads.
 

Back to Search by Commercial Project Type

   
Vaulted Tank System Installation:
   
PROJECT: 40,000-Gallon #2 Oil Vaulted Tank System Installation
CLIENT: Industrial Food Products Manufacturer, Middlesex County, NJ
DETAIL: Designed and installed two precast 20,000-gallon tank vaults, with doors, stairs, piping and monitor system instrumentation. Double walled Conley piping system plus power and sensing electrical conduit was installed inside 200 feet of 3' x 4' box culverts that crossed under roadways and railroad crossings. Finished work included lighting, ventilation, grates, vapor and liquid level sensing instrumentation, ballards and guardrails.
 

Back to Search by Commercial Project Type

   
 
 


2007 © ANCO Environmental