Emergency
Generator Tank Replacements: |
| |
|
|
PROJECT: |
Emergency Generator
Tank Replacements at various New Jersey sites |
|
CLIENT: |
Fortune 100 Communications
Company |
|
DETAIL: |
Removed
several sizable leaking USTs from mountain top microwave transceiver
facilities. Supplied temporary fuel storage. Installed piping banks,
connections made through leak and fire detection solenoid valves.
Finishing included asphalt, ballards, guardrails and overfill
instrumentation.
|
|
Back to Search by
Commercial Project Type |
| |
|
|
Leaking Underground Storage Tank Removals and Soil Remediation: |
| |
|
|
PROJECT: |
Leaking UST Removals
and Soil Remediation |
|
CLIENT: |
Dye
Manufacturer, Newark, Essex County, NJ |
|
DETAIL: |
Removed
several large #4 oil leaking underground storage tanks from a congested
plant in an urban setting. Designed and installed free product recovery
trenches to intercept and collect oil, then a vacuum pump bagged
extraction system installed inside large diameter recovery wells,
located at juncture of recovery trenches. Site restoration included
sidewalk, curbing and roadway replacement.
|
|
Back to Search by
Commercial Project Type |
| |
|
|
Phase I and II Investigations: |
|
|
|
|
PROJECT: |
Phase II and III
Investigations |
|
CLIENT: |
Private Land Developer,
Jersey City, Hudson County, NJ |
|
DETAIL: |
Anco
conducted split-spoon and Geoprobe sampling for soil investigation to
determine the extent of soil contamination at an impacted site.
Installed groundwater piezometers and completed a groundwater
investigation. Developed cost-effective remediation strategies to
address contamination at the site including a technique to remediate the
contaminated soil on-site.
|
|
Back to Search by
Commercial Project Type |
| |
|
|
Regulated Tank
Closure and Site Remediation: |
|
|
|
|
PROJECT: |
Regulated Tank Closure
and Site Remediation |
|
CLIENT: |
Former Gas Station,
Linden, Union County, NJ |
|
DETAIL: |
Coordinated the removal of 8 regulated tanks and subsequent remediation
of nearly 1000 tons of contaminated soil at a former gas station in
preparation for a sale of the property to an auto body shop. Worked
closely with NJDEP, utility companies, local building department
officials, and the Union County Road Department, as contamination
migrated into street. Assisted in the preparation of documents for state
funding and grants from the New Jersey Economic Development Authority to
lessen the owner's payment obligations.
|
|
Back to Search by
Commercial Project Type |
| |
|
|
Underground Storage Tank Dispensing System Replacement: |
| |
|
|
PROJECT: |
UST Dispensing System Replacement |
|
CLIENT: |
United Parcel Service at
Newark Airport, Newark, Essex County, NJ |
|
DETAIL: |
Installed
spill and overfill mechanisms, leak detection conduiting, double-walled
piping systems, piping sumps, dispensers and all tank attachments for
two large USTs located along runway at airport. Finish work included
lighting, concrete islands and new reinforced concrete pads.
|
|
Back to Search by
Commercial Project Type |
| |
|
|
Vaulted Tank
System Installation: |
| |
|
|
PROJECT: |
40,000-Gallon #2 Oil
Vaulted Tank System Installation |
|
CLIENT: |
Industrial Food Products Manufacturer,
Middlesex County, NJ |
|
DETAIL: |
Designed
and installed two precast 20,000-gallon tank vaults, with doors, stairs,
piping and monitor system instrumentation. Double walled Conley piping
system plus power and sensing electrical conduit was installed inside
200 feet of 3' x 4' box culverts that crossed under roadways and
railroad crossings. Finished work included lighting, ventilation,
grates, vapor and liquid level sensing instrumentation, ballards and
guardrails.
|
|
Back to Search by